XI'AN KINGWELL OILFIELD MACHINERY CO.,LTD
|
Price: | 1.0 USD |
Payment Terms: | T/T,L/C,D/P |
Place of Origin: | Shaanxi, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Y111-115/148 Packer for Oilfield
Features
Usage
Y111-115/148 Packer could be used to stratified well testing, oil recovery, water plugging and acidification. This kind of Packer could work with slip type Packer or backup slip together.
Structure theory
Running string tools according to setting height and space between tubing and top flange. Below Packer, there is tailpipe, slip type Packer or backup slip as support. String weight compress rubber element to increase the ID, which could block and seal oil or casing annular. Pull string upside, rubber element reinstate again.
Feature: increase shear pin structure, in order to avoid wrong setting. When running string tools, wrong setting would happen if Packer stopped to move down and under string weight. Shear pin structure could prevent wrong setting if running string tools and cut shear pins to down into well.
Parameter
|
Pictures
Company Introduction
Xi'an KINGWELL OILFIELD MACHINERY Co., Ltd. (KINGWELL), is a highly reputable supplier for oilfield equipment and services to Oil & Gas industries and provide complete solutions.
With over 10 years developing, we were developed from the beginning drilling service to manufacture factory who produce OCTG, DST tools and Solid control products.
Accordingly most innovative and reliable toolsKingwell set up a long-term science and technology cooperation, with xi'an petroleum University, daqing/ changqing oil&gas institute and jianghan machinery Research institute.
KINGWELL have experienced team, stronger enough to meet any challenge, we do believe honest is the base of business and cooperation, our aim is to build solid relationship with any part of honest. kingwell can provide highly efficient services to its clients resulting in accurate and timely deliveries at the best prices. Our products have been exported to Europe, American and Middle East.
Product delivery
- Payment : TT/LC
- Packaging :wood case or steel carton
-Delivery Date:within 1-2 month(s) after receiving prepayment
Any enquiry of above products or relative parts, PLS feel free contact back, and we will offer you a good price and show you our best service.